The big reveal

The PVC pipe that will hold our electrical wiring is first installed and then the electrical wires are pulled through using a fishing mechanism..  No rust here.

You can see the new forms being built that will hold the steel and cement in the adjacent photo.   This particular run is under all the windows and runs around the entire house in one continuous band.  Everything is tied to the columns. 

The arches with the supports removed.

The circular stairs are attached at the sides of the tower, a work of art.

………………………………………………………………………………………………………………………………..

You can see in the kitchen ceiling in the photo below and the Styrofoam  embeded in the ceiling.  The reinforced concrete stringers run to the beams which are are tied to the perimeter of the house and columns. 

…………………………………………………………………………………………………………………………………………..                                                                                                                                                                                                                         The interior walls are begining to take shape and you can see they get the same treatment of steel and poured concrete tieing everything together.